0% VAT on solar, battery storage & heat pumps until 31 March 2027

Workplace & fleet EV charging

Workplace EV charging — OZEV grant handled, multi-site capable

NICEIC certified workplace and fleet EV charging installations across the North East. OZEV Workplace Charging Scheme application handled. Smart load management. Multi-site centralised billing. From 2 chargers to 100+.

The business case for workplace charging in 2026

Around 24% of new UK car sales are now battery EVs (SMMT 2026 figures). The trajectory is unambiguous — workplace charging is becoming infrastructure, not a perk. Staff with EVs need to charge somewhere, and the workplace is the second-most-used location after home.

Three commercial cases stack up most often: staff retention (mid-career EV drivers actively factor workplace charging into job choices); fleet decarbonisation (Scope 1 emissions reduction, often required by tender or B Corp recertification); and customer service for retail, hotel and leisure venues where dwell time is long enough for charging to be meaningful.

  • OZEV Workplace Charging Scheme application
  • Smart load management for more chargers per supply
  • Billing integration for staff or paid access
  • Multi-site centralised management
  • NICEIC certified installation

Up to 75%

OZEV grant covers install cost

£350

Per socket OZEV cap

40 sockets

OZEV scheme max per business

£14,000

OZEV total cap per workplace

OZEV Workplace Charging Scheme

The grant route most workplaces qualify for

The OZEV Workplace Charging Scheme provides up to £350 per socket, capped at 40 sockets per applicant — total £14,000 maximum. It covers up to 75% of the install cost per socket. Most businesses with off-street parking dedicated to staff or fleet use qualify.

Eligibility

  • • Businesses, charities and public authorities
  • • Off-street parking owned or leased by the applicant
  • • Permission of landlord (if leased)
  • • Chargers must be installed by an OZEV-authorised installer (we are)
  • • Chargers must be OCPP-compliant smart units

The process

We complete the OZEV application on your behalf as part of the project. The grant value is deducted from your final invoice — there's no separate claim, no waiting period after install. Sequence: free site survey, fixed-price quote with OZEV deduction applied, signed quote, OZEV voucher issued (typically 2-4 weeks), install scheduled, invoice issued with grant value applied.

Combining with the Infrastructure Grant

The separate OZEV EV Infrastructure Grant for staff and fleets covers wider infrastructure work (substations, cabling, civils) and can stack with the per-socket Workplace Charging Scheme. Useful for larger installs where the supply needs upgrading. We assess eligibility for both during the survey.

Workplace EV charging cost

What does workplace EV charging cost?

Per-charger installed cost typically falls between £1,000 and £2,500 depending on cable run length, supply availability and authentication/billing requirements. Larger installations benefit from economies of scale on civils and cabling; OZEV grant brings net per-socket cost down by up to £350.

Site type Typical chargers Configuration Indicative cost Notes
Small office / retail 2-5 chargers Single-phase 7kW £3,500-£9,500 Typical for offices under 50 staff
Medium workplace 6-15 chargers 7kW single-phase + load balancing £11,000-£32,000 Office parks, larger retail
Large workplace / hotel 16-40 chargers Mixed 7kW + 22kW three-phase £35,000-£90,000 Multi-site billing usually required
Fleet depot / logistics 20-100+ chargers 22kW + DC rapid + smart load Bespoke Requires DNO supply uprate analysis
Destination charging Visitor-facing 7-50kW mix Bespoke Hotels, retail parks, leisure venues

Use cases

The four configurations we install most often

Staff parking

Most common configuration. 7kW chargers in dedicated staff bays, with smart load management so total power draw stays within the available supply. Authentication via RFID card or app; billing either free-as-perk, at-cost, or commercial rate.

Fleet vehicles

Dedicated fleet bays with higher charge rate (22kW three-phase) for vehicles that need full daily turnaround. Centralised reporting on fleet kWh consumption for mileage cost allocation.

Visitor and customer charging

Customer-facing chargers at hotels, retail parks, leisure venues. Payment via card/app at point of charging. Useful both as a customer service and a small revenue stream.

Mixed-use installs

Most workplaces end up needing a mix — staff fast-charge bays, slow-charge overnight bays, visitor chargers, and sometimes fleet rapid charging. Smart load management lets all of these share a single grid supply.

Smart load management

Adding more chargers without expensive supply upgrades

The biggest commercial-EV trap is over-specifying the supply. A naive install assuming every charger runs at full 7kW concurrently typically demands a 100kW+ supply for 15 chargers — which often means a DNO substation upgrade costing £30,000-£100,000+. Smart load management eliminates that.

Dynamic load balancing distributes the available supply across all active chargers. If you have 15 chargers and a 40A site supply, the system might run 4 chargers at full 7kW while throttling the others to 3kW each. As cars unplug, throttled chargers ramp up. Total throughput stays within supply limit; users get a full overnight charge without anyone realising they were sharing capacity.

Combined with solar PV on the site roof, smart load management can route surplus solar directly to charging vehicles during the day — turning workplace solar into effectively free fleet fuel. For a site already considering both commercial solar and workplace EV, the combined install is materially cheaper than two sequential projects.

Billing & access

How to charge staff, visitors and fleet drivers

Free charging as a staff perk

Simplest. Chargers are open-access for staff or RFID-gated to authorised users. No billing infrastructure needed. HMRC currently classes workplace charging as a tax-free benefit, so no P11D implications. Best for: smaller workplaces, retention-focused approach.

Charge at cost (pence per kWh)

RFID or app-authenticated, billed monthly via salary deduction or invoice. Pass-through rate at your commercial electricity cost (typically 20-30p/kWh). Fair for staff without subsidising charging at company expense. Best for: medium and large workplaces.

Commercial rate (revenue-generating)

Public-facing or visitor charging at a margin above cost (typically 40-60p/kWh). App-based payment (Octopus Electroverse, Zap-Map, Bonnet integrations). Small revenue stream and useful as a customer service for hotels, retail parks. Not usually deployed for staff-only use.

Fleet charging

Driver RFID cards or central app, with kWh consumption logged per vehicle for fleet management software (Webfleet, Geotab, Mobilize, etc.). Useful for mileage accounting, fuel cost allocation, P11D reporting.

Workplace Charging Scheme

Up to £14,000 covered — £350 × 40 sockets

The Workplace Charging Scheme (WCS) gives businesses up to £14,000 against EV chargepoint installs at their premises. Run by OZEV, it's the largest single subsidy for commercial EV infrastructure in the UK. We apply on your behalf — usually approved within 5-10 working days.

£350

per chargepoint socket

40 max

sockets per applicant

5-10 days

typical OZEV approval time

Full WCS guide →

Beyond standard 7 kW

DC fast chargers & multi-site rollout

For higher-energy workplaces (fleet depots, hotels, retail parks) and multi-site organisations, the standard 7-22 kW AC chargepoint isn't the right answer.

DC Fast Charging

22 kW · 50 kW · 150 kW

22 kW three-phase AC is the standard for fleet depots and dual-use commercial sites — full 60-80 kWh charge in 3-4 hours. 50 kW DC fast for hotel/leisure customer use (1-hour top-ups). 150 kW DC for motorway-adjacent retail or HGV-grade vehicles. We install Project EV, Rolec, EO, Alfen and Tritium hardware.

  • • OCPP 1.6+ compliant for back-office integration
  • • Built-in MID-certified metering for revenue billing
  • • G99 DNO application handled for installs above 16 A/phase

Multi-site rollout

Portfolio installs across 3+ sites

For organisations rolling out EV charging across a property portfolio (BTL landlords, retail chains, NHS estates, council depots), we offer a single multi-site framework agreement — consistent specification, single point of contact, phased install rollout. WCS applies per-applicant per-site (up to 40 × £350 per site).

  • • Single OCPP back office for portfolio reporting
  • • Driver RFID portability across sites
  • • Coordinated G99 applications

Sector specialisms

Workplace EV by sector

💼

Offices

Staff retention play. 4-8 sockets in employee parking, RFID-controlled. Free charging now generally tax-free. Typical install: 6 × 7 kW with smart load management.

🚚

Fleet depots

Overnight depot charging for commercial fleet. 22 kW each + central scheduling for off-peak tariff arbitrage. Webfleet / Geotab fleet-management integration.

🏨

Hotels & leisure

Guest amenity + revenue. 4-12 sockets covering car park, mix of 7 kW (overnight) and 22 kW (day-trip). Public-facing tariff via Bonnet / Octopus Electroverse.

🛍️

Retail parks

Footfall driver. Dwell time matches charging time (1-2 hours retail visit). 22 kW or 50 kW DC. Per-kWh tariff at commercial markup.

🏥

Healthcare

NHS trust patient/visitor + staff parking. PSDS-funded where part of broader decarbonisation. RFID + visitor-app split-access.

🎓

Schools / universities

Staff parking + visitor parking. Often combined with PSDS-funded solar + heat pump retrofit. STEM curriculum integration with live charging dashboards.

Our accreditations

Accredited, certified, and backed by independent standards

AMP Renewables accreditations: MCS Certified · NAPIT · TRUSTMARK Government Endorsed · SafeContractor Approved · Citation ISO 9001/14001/45001 · NICEIC Approved Contractor · Disability Confident Committed · Gas Safe Register · PAS 2030

MCS Certified

NAPM47760

Heat pumps & solar

NICEIC Approved

D124458

Electrical contractor

Gas Safe Register

947841

Gas appliances

Heat Geek Trained

Heat pump design specialists

TrustMark

Government endorsed

Quality scheme

SafeContractor

Approved

H&S accredited

ISO 9001

2015

Quality management

ISO 14001

2015

Environmental management

ISO 45001

2018

OH&S management

PAS 2030

:2019

Retrofit standard

NAPIT

Member

Electrical inspection

F-Gas Certified

Air conditioning refrigerant

MCS Certified

NAPM47760

Heat pumps & solar

NICEIC Approved

D124458

Electrical contractor

Gas Safe Register

947841

Gas appliances

Heat Geek Trained

Heat pump design specialists

TrustMark

Government endorsed

Quality scheme

SafeContractor

Approved

H&S accredited

ISO 9001

2015

Quality management

ISO 14001

2015

Environmental management

ISO 45001

2018

OH&S management

PAS 2030

:2019

Retrofit standard

NAPIT

Member

Electrical inspection

F-Gas Certified

Air conditioning refrigerant

Every accreditation listed is independently verified. We carry the registration numbers — ask for any on request.

Workplace EV charging FAQs

Do you handle workplace EV charging for multiple sites?

Yes, we manage multi-site installations with centralised billing, load management, and ongoing maintenance. We also handle OZEV workplace charging grant applications.

Can employees be charged for using workplace chargers?

Yes. Our installations include billing integration so you can offer free charging as a perk, charge at cost, or set a commercial rate for staff and visitors.

What is the OZEV workplace charging grant?

The OZEV Workplace Charging Scheme provides funding towards the cost of installing EV charge points at workplaces. We handle the full grant application process on your behalf.

How does load management work?

Smart load management distributes available power across all chargers dynamically, so you can install more charge points without expensive electrical upgrades.

Book a workplace EV charging site survey

Free site assessment, OZEV grant eligibility check, fixed-price quote within 2 weeks. Multi-site discounts for 3+ properties.

Free, no-obligation survey Fixed-price written quote MCS certified installation